Canadian Mining Journal


Fancamp Exploration Ltd


  • News

    MONEY: KWG offers flow-through shares and units

    August 18, 2014 by Canadian Mining Journal Editor

    TORONTO – KWG Resources has announced plans to issue both flow-through shares and units in a bid to raise between $4 million and $10 million. The money will be used for exploration at the Koper Lake and Fishtrap Lake projects, to continue…

  • News

    CHROME: KWG encouraged by latest metallurgical tests

    April 2, 2014 by Canadian Mining Journal Editor

    ONTARIO – KWG Resources of Toronto says it is encouraged by the results of recent laboratory tests using natural gas to reduce the chromite ore from the Black Horse deposit in the Ring of Fire. The new method shows promise for the…

  • News

    Editorial: KWG-Cliffs ruling – No appeasement on the easement

    October 3, 2013 by Canadian Mining Journal Editor

    The following article is reprinted with permission from CMJ’s sister publication The Northern Miner.

  • News

    CHROMITE: KWG extends two zones at Koper Lake

    July 23, 2013 by Canadian Mining Journal Editor

    ONTARIO – Initial drilling at the Koper Lake project in the Ring of Fire has extended both the Blackbird and Black Horse chromite zones. The project is a joint venture of KWG Resources and Bold Ventures (the operator), both based in…

  • News

    Lac Lamle off to a good start

    May 7, 2013 by Canadian Mining Journal Editor

    Fancamp Exploration’s (FNC-V) first resource estimate on its Lac Lamêlée South iron project in the Fermont mining district of Quebec has outlined 520 million tonnes grading 39.5% Fe at a 22% Fe cut-off grade – about…

  • News

    TEST: Synthetic rutile concentrate produced

    March 13, 2013 by Canadian Mining Journal Editor

    QUEBEC – Fancamp Exploration of Vancouver says synthetic rutile (TiO2) concentrate has been produced in pilot tests on material from the Magpie iron-titanium-vanadium-chromium project east of Sept-Iles. The high grade concentrate has the…

  • News

    IRON-TITANIUM RESOURCE: Fancamp gets Magpie numbers

    April 19, 2012 by Canadian Mining Journal Editor

    QUEBEC – Fancamp Exploration of Vancouver has received the first 43-101-compliant in-pit mineral resource estimate for the Magpie No.2 deposit from P&E Mining Consultants. The report puts 635.2 million tonnes at 42.49% Fe and 11.20%…

  • News

    IRON ORE RESOURCE: Fire Lake North number grows to over 1-B tonnes

    October 3, 2011 by Canadian Mining Journal Editor

    QUEBEC – Champion Minerals of Toronto has released a 43-101-compliant resource report that includes over a billion tonnes of resources at its Fire Lake North project near Fermont. The measured and indicated portion is 400.1 million tonnes…

  • News

    IRON ORE TESTS: Fire Lake North samples produce clean gravity results

    August 29, 2010 by Canadian Mining Journal Editor

    QUEBEC – Gravity separation tests conducted for Champion Minerals of Toronto on drill core samples from its Fi…