ONTARIO – The intercepts from underground drilling at the Taylor gold project 50 km east of Timmins are long and strong, according to St Andrew Goldfields (SAS) of Toronto. Significant assays include 16.62 g/t Au over 19.4 metres (11.95…
ONTARIO – St Andrew Goldfields (SAS) of Toronto updated results of its underground drilling program with the good news that a 12.4-metres section of core assayed 22.57 g/t Au from hole T220-022, and a 4.80-metre section assayed 12.49 g/t…
Marc Leduc is now COO of Toronto’s Lydian International. His career spans development of large mines, heap leaches and tailings areas in the United States, Costa Rica, Mexico, Chile and Peru. A veteran of Barrick’s Pierina gold mine, he was…
ONTARIO – Underground definition drilling at the Taylor gold project 50 km east of Timmins is returning high grades for owner St Andrew Goldfields of Toronto. The recent drill program was focused on the eastern portion of the 1004 lens of…
ONTARIO – As Toronto-based St Andrew Goldfields (SAS) continues to drill at its Hislop project near Timmins, the company reports that drilling continues to return encouraging results.
ONTARIO – St Andrew Goldfields (SAS) of Toronto continues to advance its Taylor gold project 53 km east of Timmins with the extraction of a 15,000-tonne bulk sample last year. The material was taken from the 1008 lens in the upper part of…
ONTARIO – Toronto-based St Andrew Goldfields (SAS) is cutting good grades at its Hislop North gold property northwest of the Hislop mine. The longest intersection was 24.0 metres (core length) grading 10.22 g/t Au including 11.91 g/t over…
St Andrews Goldfields’ goal of reaching 100,000 oz of gold production for the year is getting closer to reality.
The leaves may be falling from the trees at this time of year, and the third quarter reports are likewise fluttering around. For example, St Andrew Goldfields of Toronto set a record by producing 25,742 oz of gold in Q3 2012. For the first nine…
ONTARIO – St Andrew Goldfields (SAS) of Toronto says dewatering of the ramp at the Taylor gold project 53 km east of Timmins began in April, and the portal was open at the end of June. Once rehabilitation is done and services are…
ONTARIO – St Andrew Goldfields (SAS) of Toronto says the estimated amount of contained gold has increased by one million ounces at its Taylor gold project near Timmins. Total measured and indicated resources are 38.3 million tonnes at an…
ONTARIO and QUEBEC – Toronto-based St Andrew Goldfields produced a record amount of gold in Q4 2011 The 22,350 oz of gold is a 12% increase from Q3. The company operates the Holt, Holloway and Hislop mines in the Kirkland Lake region of Ontario.