NORTHWEST TERRITORIES – Seabridge Gold of Toronto says the preliminary feasibility study for its Courageous Lake project 240 km northeast of Yellowknife estimates contained gold to be 6.5 million oz. It predicts average annual production…
BRITISH COLUMBIA – Toronto-based Seabridge Gold has revised the pre-feasibility study for its KSM gold-copper project 65 km northwest of Stewart. The base case life of mine cash operating costs are estimated at only $148/oz of gold…