Canadian Mining Journal


Fission Uranium Corp


  • News

    URANIUM: Fission hits high grades at several areas of PLS

    August 14, 2019 by Canadian Mining Journal

    SASKATCHEWAN – Fission Uranium of Kelowna, B.C., has received the assays from the winter 2019 drill program at the Patterson Lake South property in the southwest rim of the Athabasca Basin. The company says the results confirm the potential to

  • News

    URANIUM: Fission to prepare PEA for underground only option at PLS

    July 23, 2019 by Canadian Mining Journal

    SASKATCHEWAN – Fission Uranium of Kelowna, B.C., is looking at an underground only option for mining its Patterson Lake South property on the southwest edge of the Athabasca Basin. Potential benefits of such a plan include low operating costs, lower

  • News

    URANIUM: Fission tables PFS and considers underground-only scenario at PLS

    April 15, 2019 by Northern Miner Staff

    SASKATCHEWAN – Fission Uranium has tabled a prefeasibility study (PFS) for its Patterson Lake South uranium project in Saskatchewan’s Athabasca region, outlining an open pit and underground hybrid operation. It’s working on a preliminary economic assessment (PEA) level underground only scenario

  • News

    URANIUM: Fission hits good grades outside high grade zone

    March 12, 2019 by Canadian Mining Journal

    SASKATCHEWAN – Fission Uranium of Kelowna, B.C., is pleased with the results from three holes of its winter work program at the Patterson Lake South uranium property in the Athabasca Basin. The holes were dual purpose: to expand  resources outside

  • News

    URANIUM: Fission advances PLS toward feasibility

    January 30, 2019 by Canadian Mining Journal

    SASKATCHEWAN – Fission Uranium of Kelowna, B.C., is advancing the Triple R deposit at its Patterson Lake South property to the feasibility stage. Twenty-eight geotechnical holes are to be drilled as part of the resource development phase of work. Work

  • News

    Uranium reversal may be close, Purepoint says

    November 8, 2018 by Canadian Mining Journal

    In one of the few exploration projects it is funding next year, Cameco (TSX: CCO; NYSE: CCJ) and its joint-venture partners Orano Canada and Purepoint Uranium (TSXV: PTU) are planning a 36 km ground-electromagnetic survey and 6,000 metres of diamond drilling at their Hook Lake uranium

  • News

    URANIUM: More high grades from Fission’s PLS

    September 25, 2018 by Canadian Mining Journal

    SASKATCHEWAN – Fission Uranium of Kelowna, B.C., has drilled nine more high grade holes at its Patterson Lake South uranium project near the southwest rim of the Athabasca Basin. All the holes were drilled in the R780E zone of the

  • News

    MINING PEOPLE: Norton Rose Fulbright, Anaconda Mining, Fission Uranium, and New Gold

    September 13, 2018 by Canadian Mining Journal

    Douglas B. Buchanan, a leading finance lawyer, has  joined the firm of Norton Rose Fulbright to focus on public-private partnerships (P3s). He will work with Doug Fried in the New York City office and Greg Lewis in Vancouver. Anaconda Mining

  • News

    Fission Uranium grows resource at Triple R

    February 26, 2018 by Canadian Mining Journal

    Fission Uranium grows resource at Triple R Despite uranium prices at decade lows and three years of belt tightening, Fission Uranium (TSX: FCU; US-OTC: FCUUF) has managed to increase the indicated resource at its Triple R deposit by 8% and the overall

  • News

    URANIUM: Fission plans $9.4M work program ahead of pre-feasibility at PLS

    January 16, 2018 by Canadian Mining Journal

    SASKATCHEWAN – Fusion Uranium, headquartered in  Kelowna, B.C., is preparing to start a $9.4-million winter work program at its Patterson Lake South property in the Athabasca Basin. Roscoe Postle Associates will be the lead consultant for the study. An eight-hole

  • News

    URANIUM: Fission hits exceptional grades at PLS

    January 3, 2018 by Canadian Mining Journal

    SASKATCHEWAN – Fission Uranium Corp. of Kelowna, B.C., has received assays from three of the highest grade holes drilled to date at its Patterson Lake South project in the Athabasca Basin. The holes were drilled in the R780E zone as

  • News

    URANIUM: Fission hits 128 metres with multiple high grade intervals west of R780E at PLS

    September 7, 2017 by Canadian Mining Journal

    SASKATCHEWAN – Fission Uranium of Kelowna, B.C., has drilled a new zone 2.3 km west of the R780E zone at its Patterson Lake South project on the south rim of the Athabasca Basin. Results of four holes on the new