GOLD: Anaconda expands mineralization at Goldboro

NOVA SCOTIA – Toronto-based Anaconda Mining has offered an update on the growing resources at its Goldboro gold project 185 km northeast […]
The Goldboro gold deposit in Nova Scotia remains open along strike in both directions. (Image: Anaconda Mining)

Topics

Commodities

Regions

Tags

Companies

[caption id="attachment_1003731483" align="aligncenter" width="417"] The Goldboro gold deposit in Nova Scotia remains open along strike in both directions. (Image: Anaconda Mining)[/caption] NOVA SCOTIA – Toronto-based Anaconda Mining has offered an update on the growing resources at its Goldboro gold project 185 km northeast of Halifax. Numbers for the measured and indicated category have increased and will form the basis of the mining plan in the feasibility study completed by the end of the year. The measured and indicated resources at 4.1 million tonnes averaging 5.30 g/t gold for 698,600 contained oz. That is a 6.9% increase in grade and a 15.9% increase in contained ounces as reported in July 2018. The inferred resource was expanded as well. It stands at 3.0 million tonnes grading 7.09 g/t gold for 685,100 contained oz. That represents a 6.9% rise in the grade and a 51.2% jump in contained ounces. The numbers above reflect both open pit and underground mineralization at a 2.0 g/t gold cut-off. Looking solely at the underground measured and indicated resource, the grade is up 11.9%. Anaconda says the recent drill campaign expanded the deposit to the east by 397 metres and added 21 new zones to the resource model. The deposit remains open in both directions along strike. More information about Goldboro and other projects is posted at www.AnacondaMining.com.

Comments

Your email address will not be published. Required fields are marked *

Apr 08 2024 - Apr 09 2024
Apr 15 2024 - Apr 16 2024
Apr 16 2024 - Apr 16 2024
Apr 17 2024 - Apr 18 2024