GOLD RESOURCE: Grades higher than expected at Windfall Lake

QUEBEC - Vancouver's Eagle Hill Exploration says the grades of the first resource estimate for its Windfall Lake property in the Abitibi Greenstone Belt are even higher than anticipated. The first independent 43-101 report cites an indicted...

QUEBEC - Vancouver's Eagle Hill Exploration says the grades of the first resource estimate for its Windfall Lake property in the Abitibi Greenstone Belt are even higher than anticipated. The first independent 43-101 report cites an indicted resource of 1.14 million tonnes at 9.10 g/t Au (344,000 oz of gold), plus an inferred resource of 1.69 million tonnes at 6.70 g/t Au (365,000 oz of gold). The report was prepared by SRK Consulting (Canada).

"This is a good start," stated Brad Kitchen, president and CEO of Eagle Hill. "The strong grade gold resource, in broad mineralized zones that extend horizontally by up to 25 meters, was a surprise that will require future investigation of potential mining methods while the company continues to expand the deposit."

Most of the gold zones are Windfall Lake remain open along strike, said Eagle Hill. Drilling continues along a 7.5-km long gold bearing structure.

Complete information and a photo gallery of the Windfall Lake project are posted at www.EagleHillExploration.com.

Comments

Your email address will not be published. Required fields are marked *

Mar 27 2024 - Mar 28 2024
Apr 08 2024 - Apr 09 2024
Apr 15 2024 - Apr 16 2024
Apr 16 2024 - Apr 16 2024