LITHIUM: Millennial shares positive FS for Pastos Grandes

ARGENTINA – Millennial Lithium of Vancouver says the feasibility study for its Pastos Grandes project in the province of Salta is positive. […]
The feasibility study is positive for the Pastos Grandes lithium project in Argentina. (Image: Millennial Lithium)
[caption id="attachment_1003729845" align="aligncenter" width="368"] The feasibility study is positive for the Pastos Grandes lithium project in Argentina. (Image: Millennial Lithium)[/caption] ARGENTINA – Millennial Lithium of Vancouver says the feasibility study for its Pastos Grandes project in the province of Salta is positive. The project will produce battery grade lithium carbonate. The Pastos Grandes lithium project has a life of 40 years and targeted production of 24,000 tonnes of lithium carbonate per year. It carries an after tax net present value (8% discount) of US$1.03 billion and an internal rate of return after taxes will be 24.2%. The estimated total capex is US$448.2 million and the operating cost is US$3,388 per tonne of lithium carbonate produced. The operation will rely on solar evaporation  technology and conventional lithium brine processing. A pilot plan is currently being assembled on site. See www.MillennialLithium.com.

Comments

Your email address will not be published. Required fields are marked *

Apr 17 2024 - Apr 18 2024
Apr 18 2024 - Apr 19 2024
Apr 23 2024 - Apr 23 2024
Apr 25 2024 - Apr 25 2024