DAILY NEWS Sep 20, 2012 4:56 PM - 0 comments

PLACER MINING: Construction complete at Indian River

TEXT SIZE bigger text smaller text
2012-09-20

YUKON – Construction – including roads, waterlines, settling ponds, camp, and processing plant – is complete at the Indian River placer gold mine 30 km south of Dawson City. A 150-m3/h mining plant was installed. It includes dirt moving equipment, processing plants, power generator and pump stations.

While the infrastructure was being built, approximately 25,000 m3 of gravel was stockpiled. Processing some of the stockpile resulted in the recovery of $70,000 worth of gold. Full production is planned for the 2013 season.

The Indian River project is a joint venture between Klondike Gold Corp. of Vancouver and private company 46799 Yukon Inc. More information is available at KlondikeGoldCorp.com.

Companies in This Story

Klondike Gold Corp

Monitor These Topics


Horizontal ruler
Horizontal Ruler

Post A Comment

Disclaimer
Note: By submitting your comments you acknowledge that Canadian Mining Journal has the right to reproduce, broadcast and publicize those comments or any part thereof in any manner whatsoever. Please note that due to the volume of e-mails we receive, not all comments will be published and those that are published will not be edited. However, all will be carefully read, considered and appreciated.

Your Name (this will appear with your post) *

Email Address (will not be published) *

Comments *



* mandatory fields