Canadian Mining Journal



  • News

    GOLD: Metanor cuts 10.4 g/t over 8.8 metres at Bachelor mine

    June 30, 2016 by Canadian Mining Journal

    QUEBEC – Metanor Resources of Val d’Or, QC, has intersected 10.4 g/t Au over 8.8 metres during the latest drilling in the Main vein at its Bachelor gold mine 90 km northeast of Lebel-sur-Quevillon. The intersection was made from the

  • News

    GOLD: Metanor counts additional ounces at Barry pit

    June 22, 2016 by Canadian Mining Journal

    QUEBEC – Metanor Resources of Val d’Or, QC, has increased its confidence level in the Barry open pit gold project with an updated and increased resource estimate. The update takes the measured and indicated resource to 8.42 million tonnes grading

  • News

    GOLD: Metanor plans restart for Barry open pit

    February 11, 2016 by Canadian Mining Journal

    QUEBEC – Metanor Resources of Val d’Or, QC, is planning to reopen the Barry open pit gold mine in the Urban-Barry greenstone belt. Ghislain Morin, president and CEO of Metanor said, “We feel that the metrics are optimal for a