Canadian Mining Journal



  • News

    COBALT-GOLD: Fortune updating NICO feasibility

    April 19, 2018 by Canadian Mining Journal

    NORTHWEST TERRITORIES – Fortune Minerals of London, Ont., is updating the 2014 feasibility study for its NICO cobalt-gold-bismuth-copper project 160 km northwest of Yellowknife. The project is one of the few new cobalt mines that could be in production by

  • News

    Nevsun completes prefeasibility at Timok

    April 16, 2018 by Canadian Mining Journal

    Nevsun Resources (TSX: NSU; NYSE-AM: NSU) has a busy year ahead. In early April, the mid-tier base metals company released a prefeasibility study for the Cukaru Peki Upper Zone, part of its 213 sq. km Timok copper-gold project near Bor, Serbia.

  • News

    Trilogy notches PFS milestone on journey to develop Ambler mining district

    April 11, 2018 by Canadian Mining Journal

    Trilogy Metals Inc. (TSX/NYSE American: TMQ) has tabled results from a positive pre-feasibility study (PFS) for its polymetallic Arctic deposit, which is part of its larger land holdings in the Ambler Mining District in northwestern Alaska. A proposed mine at Arctic

  • News

    GOLD: Granada chooses Ausenco for mine study

    April 9, 2018 by Canadian Mining Journal

    QUEBEC – Granada Gold Mine of Rouyn Noranda, Q.C., is moving forward with the feasibility study for its Granada mine in the town. The company  has selected Ausenco Limited to create a feasibility study for an open pit with annual

  • News

    GOLD: Osisko cuts 403 g/t over 2.7 metres at Windfall

    April 5, 2018 by Canadian Mining Journal

    QUEBEC – Osisko Mining of Toronto continues its drilling success at the Windfall gold project in Urban Twp. The bonanza this time is 403 g/t gold over 2.7 metres in the Lynx zone. Osisko is conducting an 800,000-metre drill program

  • News

    GOLD: Eldorado expects Lamaque AISC to be $717/oz

    March 22, 2018 by Canadian Mining Journal

    QUEBEC – Eldorado Gold Corp. of Vancouver has completed a pre-feasibility study for development of the Triangle deposit and refurbishing the Sigma mill at its Lamaque gold project in Val d’Or. As envisioned the underground producer would have an peak

  • News

    GOLD: New intersections confirm East Cadillac mineralization over 3.5 km for Chalice

    March 6, 2018 by Canadian Mining Journal

    QUEBEC – Chalice Gold Mines of Perth, Western Australia, says drilling at its East Cadillac project has traced the gold mineralization more than 3.5 km along strike on the Larder Lake-Cadillac Fault. The project is located 35 km east of

  • News

    GOLD: Mirado promises 158% IRR for Orefinders

    March 1, 2018 by Canadian Mining Journal

    ONTARIO – Toronto-based Orefinders Resources has filed the preliminary economic assessment for the South zone open pit at the Mirado gold project located southeast of Kirkland Lake. According to figures in the PEA, the zone will provide an after tax

  • News

    COPPER-GOLD: Nautilus completes PEA for Solwara 1 project

    February 27, 2018 by Canadian Mining Journal

    PAPUA NEW GUINEA – Toronto-based Nautilus Minerals has completed the preliminary economic assessment for its Solwara 1 seabed copper-gold project in the Bismarck Sea. Nautilus has been inching the Solwara 1 project forward for almost 40 years. The project has

  • News

    GOLD: Monarques says updated PFS for Croinor is positive

    February 8, 2018 by Canadian Mining Journal

    QUEBEC – Monarques Gold of Montreal has updated the pre-feasibility study for its Croinor project with a 10% increase in proven and probable reserves, a 16% decrease in operating costs, and a 13% cut to total costs. The revised study

  • News

    GOLD: Atlantic reveals new mine plan for Moose River project

    January 29, 2018 by Canadian Mining Journal

    NOVA SCOTIA – Vancouver-based Atlantic Gold Corp. has completed the second phase of its life of mine expansion for the Moose River Consolidated (MRC) pre-feasibility study. Production is to be increased to 200,000 oz./year at an all-in sustaining cost of

  • News

    Yorbeau tables Scott Lake PEA

    January 24, 2018 by Canadian Mining Journal

    Yorbeau Resources (TSX: YRB) has announced a new resource estimate and preliminary economic assessment (PEA) for its 100% owned Scott Lake polymetallic project in the Chibougamau area of Quebec. Scott Lake’s 63.37 sq. km includes 18 km in length of the