Canadian Mining Journal



  • News

    GOLD: Wesdome scores more high grades at Kiena

    November 16, 2016 by Canadian Mining Journal

    QUEBEC – Drilling by Wesdome Gold Mines of Toronto at the suspended Kiena gold mine in Val d’Or continues to return high values – as high as 749.96 g/t Au over 2.40 metres uncut (or 23.28 g/t cut to 34.28

  • Feature

    High Gold Grades Give New Hope for Closed Kiena Mine

    October 1, 2016 by Russell Noble

    Work by Wesdome Gold Mines holds promise.

  • News

    GOLD: Wesdome drills high grades at old Kiena mine

    August 25, 2016 by Canadian Mining Journal

    QUEBEC – Wesdome Gold Mines of Toronto has drilled very high gold grades at the suspended Kiena mine in Val d’Or. The longest intersection was 94.35 g/t Au over 17.40 metres uncut (18.03 g/t cut) in hole U-6124. Two drills