Canadian Mining Journal



  • News

    COPPER: Ivanhoe ups indicated resource 50% at Kakula

    February 26, 2018 by Canadian Mining Journal

    Kakula geologists (from left) Alain Kyatenga and Maria Mwenya, and mining engineer Sylver Nzam logging core at the core shed. (Image: Ivanhoe Mines) DEMOCRATIC REPUBLIC OF CONGO – Vancouver-based Ivanhoe Mines has a new resource estimate for its high grade

  • News

    Fission Uranium grows resource at Triple R

    February 26, 2018 by Canadian Mining Journal

    Fission Uranium grows resource at Triple R Despite uranium prices at decade lows and three years of belt tightening, Fission Uranium (TSX: FCU; US-OTC: FCUUF) has managed to increase the indicated resource at its Triple R deposit by 8% and the overall

  • News

    Peregrine Diamonds boosts resource at Chidliak

    February 22, 2018 by Canadian Mining Journal

    A resource update has brought the combined inferred resource of just two of seventy-four known kimberlites to 22 million carats at Peregrine Diamonds‘ (TSX: PGD) Chidliak project in the Canadian Arctic. “This result absolutely has positioned Chidliak in the Canadian development

  • News

    Liberty Gold releases maiden resource for Goldstrike

    February 14, 2018 by Canadian Mining Journal

    Liberty Gold (TSX: LGD) has completed the first resource estimate on its flagship 100%-owned Goldstrike project in southwestern Utah. The oxide gold project near the Nevada border in the eastern Great Basin is a Carlin-style gold system that produced 209,000 ounces

  • News

    GOLD: Monarques says updated PFS for Croinor is positive

    February 8, 2018 by Canadian Mining Journal

    QUEBEC – Monarques Gold of Montreal has updated the pre-feasibility study for its Croinor project with a 10% increase in proven and probable reserves, a 16% decrease in operating costs, and a 13% cut to total costs. The revised study

  • News

    COBALT: eCobalt ups resources at Idaho cobalt project

    February 7, 2018 by Canadian Mining Journal

    IDAHO – Vancouver-based eCobalt Solutions has released an  updated and increased resource estimate for its Idaho cobalt project. The project, about 40 km west of Salmon, is in the advanced stages of exploration. The new estimate was made on the

  • COPPER-GOLD: EIS contractor hired for Pebble project

    February 6, 2018 by Canadian Mining Journal

    ALASKA – Vancouver-based Northern Dynasty says everything is moving forward at its Pebble copper-gold project 380 km from Anchorage. The U.S. Army Corps of Engineers approved the hiring of AECOM as an independent, third party contractor to work with the

  • News

    NICKEL-COPPER: Landore updates estimate for B4-7 deposit at Junior Lake

    February 5, 2018 by Canadian Mining Journal

    ONTARIO – Additional drilling by Landore Resources of London, U.K., has allowed the company to report a 43% increase in total resources for the B4-7 nickel-copper-cobalt-PGM deposit on its Junior Lake property. The property lies about 235 km north-northeast of

  • News

    URANIUM: Denison says updated Gryphon estimate nearly doubles

    January 31, 2018 by Canadian Mining Journal

    SASKATCHEWAN – Toronto-based Denison Mines Corp. says the indicated mineral resource at the Wheeler River project has grown 88% with the latest updated numbers for the Gryphon uranium deposit. Wheeler River is located on the eastern edge of the Athabasca

  • News

    ZINC: Callinex finds 10% Zn and expands Nash Creek deposit

    January 18, 2018 by Canadian Mining Journal

    NEW BRUNSWICK – The Bathurst Mining Camp continues to reward those who drill it. This time the company is Callinex Mines of Vancouver, and the rewards are to be found in the near surface Nash Creek zinc deposit. Here are

  • News

    Barkerville on track for resource estimate in 2018

    January 16, 2018 by Canadian Mining Journal

    With ten rigs active for most of last year and 157,000 metres of drilling, Barkerville Gold Mines (TSXV: BGM) says the program at its gold project in British Columbia was among the biggest drill campaigns in the junior mining space. The 2017

  • News

    GOLD: Eastmain’s new resource numbers larger than historic estimate

    January 9, 2018 by Canadian Mining Journal

    QUEBEC – Toronto-based Eastmain Resources has updated the resource estimate for its Eastmain gold project in the Otish Mountains. The property produced 40,000 oz. of gold in 1995 when a bulk sample was mined.. The new resource numbers include historic