Canadian Mining Journal



  • News

    GOLD: Wesdome upgrades Kiena resources, extends Deep A zone along plunge

    December 13, 2018 by Canadian Mining Journal

    QUEBEC – Wesdome Gold Mines of Toronto has circulated an interim mineral resource for its 100% owned Kiena mine complex in Val d’Or. The estimate is based on drilling completed to Oct. 12, 2018. Since then, the Deep A zone

  • News

    GOLD: Granada updates resources in feasibility study

    December 12, 2018 by Canadian Mining Journal

    QUEBEC – SGS Canada has delivered an updated mineral resource of the Granada gold property near Rouyn-Noranda. Owner Granada Gold Mine, headquartered in Rouyn-Noranda, was also supplied with a revised block model for the entire area. Pit constrained measured and

  • News

    GOLD: Anaconda files updated resource estimate for Goldboro

    December 10, 2018 by Canadian Mining Journal

    NOVA SCOTIA – Anaconda Mining of Toronto has filed an updated 43-101 report for the resources at its Goldboro gold project 175 km northeast of Halifax. The deposit is now thought to contain 3.8 million measured and indicated tonnes grading

  • News

    COPPER: Capstone increases reserves and planned production at Mexican copper project

    December 10, 2018 by MINING.COM Staff

    MEXICO – Capstone Mining released today positive results of an updated technical report for its Cozamin mine, located north-northwest of Zacatecas City in the Mexican north-central state of the same name. Cozamin is a polymetallic underground mine with a surface

  • News

    ZINC: Osisko Metals releases Pine Point inferred pit resource

    December 6, 2018 by Canadian Mining Journal

    NORTHWEST TERRITORIES – Osisko Metals, headquartered in Montreal, has updated the inferred pit resource for the Pine Point zinc-lead deposit near Hay River. The estimate was prepared by BBA Inc. The Pine Point pit constrained, inferred resource is 38.4 million

  • News

    LITHIUM: International Lithium estimates 25-year mine life at Mariana JV with new study

    December 6, 2018 by Northern Miner Staff

    ARGENTINA – International Lithium could produce 10,000 tonnes of lithium carbonate equivalent per year over a 25-year mine life at its Mariana lithium brine project, according to a recent preliminary economic assessment. It could also produce 84,000 t/y sulphate of potash.

  • News

    GOLD: Victoria Gold boosts Eagle’s ounces and grade

    December 5, 2018 by Northern Miner Staff

    YUKON – Victoria Gold Corp. has increased the tonnage, gold grade and ounces in the measured and indicated category at its Eagle deposit in the Yukon, where the Toronto-based company expects to start pouring gold in the second half of

  • News

    GOLD-COPPER: Loma Larga feasibility looks promising, says INV Metals

    November 29, 2018 by Canadian Mining Journal

    ECUADOR – Toronto-based INV Metals is in receipt of a positive feasibility study for its 100% owned Loma Larga gold-copper-silver project 30 km southwest of Cuenca. The study examines an underground mine and 3,000-t/d mill that will produce gold-pyrite and

  • News

    GOLD: Rubicon announces positive reconciliation in test mining at Phoenix

    November 29, 2018 by Northern Miner Staff

    ONTARIO – A bulk sampling and test mining exercise at Rubicon Minerals Phoenix gold project has yielded positive reconciliation results that validate the 2018 mineral resource estimate as well as the new geological model and structural interpretation of the F2 deposit, the

  • News

    TIN-ZINC: Tinka boosts resource at Ayawilca in Peru

    November 27, 2018 by Northern Miner Staff

    PERU – Additional drilling at its 100%-owned Ayawilca project in the zinc-lead-silver belt of central Peru, 200 km northeast of Lima, has significantly grown the project’s resource estimate from a maiden resource estimate in 2015, Tinka Resources says. The carbonate replacement

  • News

    COPPER-IRON-GOLD: Capstone updates feasibility for Santo Domingo

    November 26, 2018 by Canadian Mining Journal

    CHILE – Capstone Mining Corp. of Vancouver has updated the feasibility study for the  Santo Domingo iron oxide-copper-gold (IOCG) development project in the Atacama desert. Capstone holds a 70% interest, and Korea Resources Corp. holds the balance. The updated feasibility

  • News

    GOLD-COPPER: Eldorado’s Gold’s Bolcana project has 6.5M oz of gold

    November 26, 2018 by Northern Miner Staff

    ROMANIA – A maiden resource estimate on Eldorado Gold’s Bolcana copper-gold project in Romania, about 6.0 km from the company’s Certej project, has delivered 6.5 million inferred oz. of gold. The inferred resource of 381 million tonnes grading 0.53 g/t gold