Canadian Mining Journal



  • News

    GOLD: Met tests could cut capex and opex for Marathon’s Valentine Lake project

    April 7, 2016 by Canadian Mining Journal

    NEWFOUNDLAND – The results of bottle roll cyanide leach tests done on mineralized material from Marathon Gold Corp.’s Valentine Lake project 55 km south of Buchans are encouraging. Thibault & Associates carried out the tests for the Toronto-based company. Gold

  • News

    GOLD: Marathon deposit grows, thanks to step out drilling

    March 30, 2016 by Canadian Mining Journal

    NEWFOUNDLAND – Marathon Gold Corp. has completed 13 widely spaced step out holes and the results point toward a mineralized corridor of at least a 1.7 km strike length at its Marathon deposit in the Valentine gold camp 55 km