ZINC-GOLD-COPPER: Feasibility optimized for Chieftain’s Tulsequah project
BRITISH COLUMBIA – Capex is reduced and production costs will be in the bottom quartile of zinc cash costs, according to the optimized feasibility study prepared for the Tulsequah Chief zinc-gold-copper-silver-lead project of Toronto's...