The Amable pit at the Veladero mine in Argentina. Blasthole drills in the background prepare the upper bench for blasting, while a 36-m3 shovel loads broken rock into 257-tonne haul trucks on the lower bench.
Your email address will not be published. Required fields are marked *
Save my name, email, and website in this browser for the next time I comment.
Δ
Comments