1000204567-1000292408

The LL dam at the downstream end of the tailings impoundment, measuring 2.5 km long and 145 m tall, is one of the larger earth-fill tailings dam structures in Canada. Water from the seepage pond (foreground) is pumped back into the tailings impoundment.

Comments

Your email address will not be published. Required fields are marked *

Dec 06 2023 - Dec 07 2023
Dec 11 2023 - Dec 12 2023
Dec 11 2023 - Dec 12 2023
Dec 13 2023 - Dec 14 2023