COPPER MINING – Minto mine makes first concentrates

YUKON - Vancouver-based SHERWOOD COPPER has produced its first copper-gold concentrates from the Minto open pit min...
YUKON - Vancouver-based SHERWOOD COPPER has produced its first copper-gold concentrates from the Minto open pit mine, 240 km northwest of Whitehorse. Commissioning of various mill components is underway with low-grade (1.0-1.5% Cu) ore. Production from high grade material (2.0-4.0% Cu) will begin once the mill has been bedded down and is running satisfactorily.

The company expects the mill to reach a throughput of 2,400 t/d during Q3 2007, 50% above the original designed capacity. Further expansions are on the drawing board.

Check out the complete story of the Minto development in the May 2007 issue of Canadian Mining Journal.

Comments

Your email address will not be published. Required fields are marked *

May 06 2024 - May 07 2024
May 13 2024 - May 14 2024
May 13 2024 - May 14 2024
May 21 2024 - May 23 2024