GOLD RESERVES Brisas Figures Jump 22%

VENEZUELA Proven and probable reserve figures have jumped 22% at the Brisas gold/copper project in Bolivar State.
VENEZUELA Proven and probable reserve figures have jumped 22% at the Brisas gold/copper project in Bolivar State. The latest figures are 407 million tonnes grading 0.70 g/t Au and 0.13% Cu. Contained gold is estimated to be 91.2 million oz and copper increased to 1.15 billion lb. The project is owned by GOLD RESERVE of Spokane, Wash.

PINCOCK ALLEN & HOLT prepared the Brisas mineral reserve analysis based on 180,000 metres of diamond drilling in 803 holes. AKER KVAERNER is heading the work on a bankable feasibility study for a 70,000-tonnes/day conventional flotation plant, an on-site gold smelter, and shipment of gold/copper concentrate for toll smelting.

Learn more about the work that has been completed in preparation for mining the Brisas deposit at www.GoldReserveInc.com.

Comments

Your email address will not be published. Required fields are marked *

Apr 18 2024 - Apr 19 2024
Apr 23 2024 - Apr 23 2024
Apr 25 2024 - Apr 25 2024
May 06 2024 - May 07 2024