Canadian Mining Journal


Yorbeau Resources Inc


  • News

    COPPER-ZINC: Yorbeau resumes drilling at Scott project

    January 29, 2019 by Canadian Mining Journal

    QUEBEC – Montreal’s Yorbeau Resources has resumed diamond drilling at its Scott copper-zinc property between the towns of Chibougamau and Chapais. The goal is to identify an extension of the deposit west of the Gwillim fault. A preliminary economic assessment

  • News

    Yorbeau tables Scott Lake PEA

    January 24, 2018 by Canadian Mining Journal

    Yorbeau Resources (TSX: YRB) has announced a new resource estimate and preliminary economic assessment (PEA) for its 100% owned Scott Lake polymetallic project in the Chibougamau area of Quebec. Scott Lake’s 63.37 sq. km includes 18 km in length of the

  • News

    COPPER-ZINC: Yorbeau enjoys excellent conc grades, recoveries from Scott project

    August 29, 2017 by Canadian Mining Journal

    QUEBEC – Yorbeau Resources of Montreal says the reports are very positive from metallurgical tests of material from its Scott copper-zinc project 20 km west of Chibougamau. Concentrate grades were excellent, and recoveries good. A 55-kg composite sample was sent

  • News

    COPPER-ZINC: Yorbeau cuts high grade massive sulphides at Caribou property

    May 30, 2017 by Canadian Mining Journal

    QUEBEC – Montreal-based Yorbeau Resources has intersected high grade massive sulphide mineralization in two holes in the gap at the Caribou lens. Hole CAR-31W returned 2.9% copper, 6.9% zinc and 44.4 g/t silver over 2.5 metres at a depth of

  • News

    COPPER-ZINC: Scott resources triple, Yorbeau pleased

    February 14, 2017 by Canadian Mining Journal

    QUEBEC – Yorbeau Resources of Montreal says the updated resource estimate at its Scott copper-zinc-gold-silver property near Chibougamau has tripled since an earlier estimate was compiled in 2011. The new 43-101 report was prepared by Roscoe Postle Associates. The current

  • News

    ZINC-COPPER: Yorbeau extends Gap lens at Scott Lake

    November 23, 2016 by Canadian Mining Journal

    QUEBEC – Yorbeau Resources of Montreal continues to extend the Gap lens at its Scott Lake project 20 km west of Chibougamau. Recent drilling returned 20.6 metres of 5.9% Zn, 0.7% Cu and 50.9 g/t Ag including 6.5 metres of

  • News

    MINING PEOPLE: Atlantic Gold, Geoscience BC, MX Gold, Nemaska, Rouge (Fiore), and Yorbeau

    July 14, 2016 by Canadian Mining Journal

    Atlantic Gold Corp. of Vancouver has appointed Maryse Belanger as COO, effective July 17. She was most recently CEO and managing director of Mirabela Nickel. Former COO John Morgan is retiring but will continue to advise the company. Bas Brusche

  • News

    COPPER-ZINC: Scott Lake gives up more high grades for Yorbeau

    January 6, 2016 by Canadian Mining Journal

    QUEBEC – Yorbeau Resources of Montreal continues to drill at the Scott Lake 20 km west of Chibougamau and reports more higher grade massive sulphide mineralization. Hole SC-82W returned 0.7% Cu and 12.1% Zn over 5.0 metres about 45 metres

  • News

    COPPER-ZINC: Yorbeau drills new sulphide lens at Scott Lake

    July 9, 2015 by Canadian Mining Journal Editor

    QUEBEC – Yorbeau Resources of Montreal says the third hole in a gap zone, a 67-metre step-out from the discovery hole, at Scott Lake confirms the discovery of a new massive sulphide lens outside the current resource. The find is on a new…

  • News

    MINING PEOPLE: First Bauxite, Harting, Jaguar, Reservoir Minerals, Taseko, and Yorbeau

    August 28, 2014 by Canadian Mining Journal Editor

    Alan Roughead has replaced Hilbert Shields as president and CEO at First Bauxite Corp. Roughead was managing director of Queensland Magnesia until its sale in 2012. He will be relocating to the company’s head office in Toronto.

  • News

    GOLD RESOURCES: Yorbeau releases Augmitto Block numbers

    October 13, 2011 by Canadian Mining Journal Editor

    QUEBEC – Yorbeau Resources of Montreal has filed a 43-101 report for the Augmitto Block of its Rouyn property 4 km south of Rouyn-Noranda. The report notes measured and indicated resources of 247,000 tonnes averaging 6.08 g/t Au plus an…

  • News

    GOLD RESOURCES: Yorbeau cites modest 200,000 oz at Augmitto

    August 23, 2011 by Canadian Mining Journal Editor

    QUEBEC – Montreal’s Yorbeau Resources has released the resource estimate for the Augmitto deposit, part of its Rouyn project. The measured and indicated portion totals 247,000 tonnes grading 6.08 g/t Au, and the inferred portion is 633,000…