LITHIUM: Millennial Lithium’s project center in Argentina goes solar

ARGENTINA – Millennial Lithium announced that its Pastos Grandes Salar lithium brine project in Argentina is now home to a solar-powered permanent […]

Topics

Commodities

Regions

Tags

Companies

ARGENTINA – Millennial Lithium announced that its Pastos Grandes Salar lithium brine project in Argentina is now home to a solar-powered permanent project center, which includes a 60 to 100 person camp with dorms and other facilities, an on-site laboratory, and a process pilot plant under construction. In a media statement, the Vancouver-based miner highlighted the fact that a state-of-the-art hybrid solar power system is in charge of providing electricity to the center while reducing carbon dioxide emissions by 147 tonnes annually and the costs for fuel by $250,000 per year. “We at Millennial are excited to be on the leading edge of the green revolution in commissioning our renewables powered project development park,” the company’s president and CEO, Farhad Abasov, said in the press brief. “This follows through on our personal commitment to the environment while preserving shareholder value, and our goal of producing lithium products with a low CO2 footprint.” According to Abasov, the hybrid solar power system for the project center is the first of its type in the Puna region of northern Argentina and, on top of being environmentally friendly, it will help the company quantify and maximize the benefit of renewable energy saturation in its commercial operations engineering and commissioning. The CEO explained that Puna has one of the highest levels of solar loading in the world. Thus, Millennial solicited proposals for renewable energy systems from local firms and ended up choosing Ergy Solar to install and commission an integrated solar photovoltaic, battery and backup conventional power generation system. The system utilizes 540 (1,050 m2) photovoltaic panels of 330 Wp each totaling 178.2 kWp of solar power, a 500 kWh maximum storage bank of batteries and two low emission diesel generators. Abasov also said that the hybrid solar system is managed by a "smart" central controller that constantly reads loads and optimizes power output to the project center and the batteries to take advantage of the high levels of solar resources in the region. The PV panel and battery system can provide power at maximum capacity for more than 18 hours throughout the daily 24-hour cycle, with diesel generator back-up only for some peak energy consumption times and infrequent non-sun events. Millennial’s press release states that within the project center there is an on-site lab with an Agilent Technologies model 5110 2-axis ICP-OES analyzer that is expected to provide quick turnaround of analyses for the ongoing pilot ponds system and a pilot plant that should have a 3-t/month output of battery quality lithium carbonate. This story first appeared on www.Mining.com.

Comments

Your email address will not be published. Required fields are marked *

May 06 2024 - May 07 2024
May 13 2024 - May 14 2024
May 13 2024 - May 14 2024
May 21 2024 - May 23 2024