
Former Tk’emlúps chief defends land, mineral rights
Former Tk’emlúps chief Shane Gottfriedson firmly rejected Kamloops Mayor Reid Hamer-Jackson’s recent plea to withdraw the decade-old land claim. Gottfriedson emphasized the […]

Former Tk’emlúps chief Shane Gottfriedson firmly rejected Kamloops Mayor Reid Hamer-Jackson’s recent plea to withdraw the decade-old land claim. Gottfriedson emphasized the […]

Scottie Resources (TSXV: SCOT; US-OTC: SCTSF) is to pivot from explorer to developer with a plan to begin gold production in 2028 […]
DENVER – Maptek and VUMA, a subsidiary of Bluhm Burton Engineering, have agreed to collaborate in the design on underground mines and […]
SASKATCHEWAN – Vancouver’s NexGen Energy is enjoying bonus high grades at its Arrow deposit, the most promising part of the Rook I […]
QUEBEC – Fifty years ago Volvo Construction Equipment (Volvo CE) launched the world’s first articulated hauler, the Volvo DR 631, in Braås, […]
YUKON – ATAC Resources of Vancouver has filed the preliminary economic assessment for the Tiger deposit at its Rackla gold project 55 […]
MISSISSAUGA, ON – KSB now offers a new family of mounting adapters that will make it simple to install KSB’s efficient and […]
BRAZIL – The S11D project in Canaã dos Carajás is in the world spotlight as truckless mining production is slated to begin […]
PENNSYLVANIA – Eriez 5-Star Service® capabilities include rebuild/repair of a wide range of equipment manufactured by both Eriez and competitor companies. According […]
NEVADA – Premier Gold Mines of Thunder Bay, ON, continues to drill high grade mineralization at its McCoy-Cove project in the Battle […]
NEWFOUNDLAND – Toronto-based Marathon Gold Corp. has drilled its highest ever gold interval – 190.88 g/t Au (uncut) over 0.7 metres – […]
QUEBEC – Dios Exploration of Montreal has released a structural gold map of its Heberto zone. The holes were shallow (150 to […]
NEWFOUNDLAND – Anaconda Mining of Toronto processed a 7,800-tonne high grade sample from the East zone at its Stog’er Tight deposit 3.5 […]
NEWFOUNDLAND – Toronto-based Anaconda Mining has extended the strike length of its Stog’er Tight gold deposit to 500 metres. The result was […]