Diavik’s wind farm facts
|
INVESTMENT: |
|
$30 million |
|
Rio Tinto and Harry Winston Diamond Corp |
|
8 year payback |
|
Project design and management: DDMI |
|
ENVIRONMENTAL (ANNUAL REDUCTIONS) |
|
4 million litres diesel |
|
100 truckload equivalent |
|
12,000 tonnes CO2 |
|
6% reduction GHG |
|
TECHNICAL: |
|
Four Enercon E70 generators |
|
Direct-drive design to -40C |
|
2.1 to 6 MW range of total online capacity |
|
9.2 MW total installed capacity |
|
17 GWh annual production |
|
DIMENSIONS: |
|
Tower hub height: 64 m |
|
Generator weight: 55 t |
|
Total Blade Diameter: 70 m |
|
Total Height: 100 m |
|
TIMELINE |
|
Wind data collection 2008-2010 |
|
Construction start 2011 |
|
Delivery via winter road early 2012 |
|
Erection and commissioning late 2012 |
Comments