QUEBEC – Integra Gold Corp. of Vancouver has filed an independent 43-101 report on the Lamaque gold project at Val d'Or. The updated resource includes a further 126 holes drill at the Triangle zone (33,000 metres) and the Parallel zone (12,400 metres).
Using a cut-off grade of 0.5 g/t Au the following estimate was made:
Indicted resources |
|
|
|
Triangle | 1.32 million tonnes | 10.4 g/t Au | 441,580 oz |
Parallel | 462,900 tonnes | 9.6 g/t Au | 142,890 oz |
Inferred resources | |||
Triangle | 429,300 tonnes | 11.0 g/t Au | 152,370 oz |
Parallel | 153,700 tonnes | 15.0 g/t Au | 73,880 oz |
Integra is planning an additional 50,000 metres of drilling at Lamaque this year. Eight drill rigs are currently in operation.
To view a location map of infrastructures and known zones at Lamaque please click here to go to the Integra website.
Comments