BRIDGE: AIL’s Ultra-Cor economical solution for haul roads

SACKVILLE, New Brunswick – When a Quebec mine site needed to construct a steam crossing for a new heavy haul road, the miner chose Atlantic Industry Limited's Ultra-Cor for all the right reasons:

SACKVILLE, New Brunswick – When a Quebec mine site needed to construct a steam crossing for a new heavy haul road, the miner chose Atlantic Industry Limited's Ultra-Cor for all the right reasons:

  1. Building with Ultra-Cor is faster and more economical than building a traditional bridge.
  2. Ultra-Cor is environmentally friendly because there is no need to disturb the riverbed.
  3. On-site installation is fast since there are no ribs.
  4. The extra deep corrugations of Ultra-Cor support the heaviest loads.

The structure in Quebec was designed for heavy loading with a 19.6-metre span and a 9.83-metre rise. Plate assembly was completed in one week.

Ultra-Cor combines all the advantages of lightweight construction with previously unheard-of strength and durability to create the largest corrugated metal structures in the world today.

Learn more about Ultra-Cor, the world’s strongest structural steel plate at Atlantic Industries' website, www.AIL.ca

Comments

Your email address will not be published. Required fields are marked *

Apr 23 2024 - Apr 23 2024
Apr 25 2024 - Apr 25 2024
May 06 2024 - May 07 2024
May 13 2024 - May 14 2024