GOLD: Marathon continues to drill good grades at Valentine

NEWFOUNDLAND – Toronto-based Marathon Gold Corp. is intersecting good grades as it drills to the northeast and southeast of the Main zone […]
Visible gold in a sample from the Valentine project. (Image: Marathon Gold Corp.)

Topics

Commodities

Regions

Tags

Companies

NEWFOUNDLAND – Toronto-based Marathon Gold Corp. is intersecting good grades as it drills to the northeast and southeast of the Main zone at the Valentine gold project 55 km south of Buchans. [caption id="attachment_1003730504" align="alignleft" width="269"] Visible gold in a sample from the Valentine project. (Image: Marathon Gold Corp.)[/caption] The drill campaign is part of the company’s effort to expand the resource estimate at the project. Continuity has been established along the 1,500-metre Main zone strike length and to the depth of the planned open pit. The mineralization below the planned pit bottom is open. The best results were 3.36 g/t gold over 13.0 metres, 3.87 g/t over 11.0 metres, and 1.44 g/t over 62.0 metres. More detailed results can be found on the company’s website in the news release dated Sept. 3, 2019. Assays are pending for holes that cut quartz-tourmaline-pyrite-gold veins at the northwest end of the pit design and southwest along strike on the Main zone corridor. Marathon has three drills operating at the Valentine project and plans to complete a 20,000-metre drill program this month. The results will be used to update the resource estimate. The pre—feasibility study is scheduled for Q2 2020. Valentine project highlights and details are posted at www.Marathon-Gold.com.

Comments

Your email address will not be published. Required fields are marked *

Dec 03 2024 - Dec 05 2024
Mar 31 2025 - Apr 03 2025