GOLD: TMAC drills more high grades at Doris North BTD Extension zone

NUNAVUT – Toronto-based TMAC Resources continues its underground expansion and in-fill drilling at the Doris North BTD Extension zone at the Hope […]
Doris North BTD Extension underground drilling highlights. (Image: TMAC Resources)
[caption id="attachment_1003731256" align="aligncenter" width="366"] Doris North BTD Extension underground drilling highlights. (Image: TMAC Resources)[/caption] NUNAVUT – Toronto-based TMAC Resources continues its underground expansion and in-fill drilling at the Doris North BTD Extension zone at the Hope Bay gold mine 65 km east of Bathurst Inlet. The work has confirmed the continuity of high grade mineralization. The drill program includes sill development in advance of ore production from the zone in the fourth quarter. Highlights from the recent underground drill program include hole TMBE-19-50148 that returned 196.1 g/t gold over 6.8 metres; and TMDBE-19-50510 that returned  31.6 g/t over 1.2 metres and 26.8 g/t over 9.3 metres; and hole TMDBE-19-50528 that tested 87.5 g/t gold over 6.6 metres, and 19.7 g/t over 4.9 metres. TMAC is developing the southern portion of the Doris North BTD Extension zone, with sill development on five levels in preparation for longhole mining. In addition, the exploration drive is being extended 125 metres to the north, which will allow further expansion drilling late this year and next. More information about TMAC’s underground and regional drill activities can be found at www.TMACresources.com.

Comments

Your email address will not be published. Required fields are marked *

Apr 18 2024 - Apr 19 2024
Apr 23 2024 - Apr 23 2024
Apr 25 2024 - Apr 25 2024
May 06 2024 - May 07 2024