NICKEL: Vale, Glencore team up to explore near Sudbury

SUDBURY, Ont. – Yesterday Vale and Glencore announced that they are planning to create a joint feasibility study to explore and develop […]
Jill Vienneau, geologist II at the Nickel Rim South mine that is the subject of a joint study by Vale and Glencore that will potentially save jobs. (Image: Glencore, Sudbury Integrated Nickel Operations)
SUDBURY, Ont. – Yesterday Vale and Glencore announced that they are planning to create a joint feasibility study to explore and develop mineralization accessible from Glencore’s Nickel Rim South mine. [caption id="attachment_1003725993" align="alignright" width="300"] Jill Vienneau, geologist II at the Nickel Rim South mine that is the subject of a joint study by Vale and Glencore that will potentially save jobs. (Image: Glencore, Sudbury Integrated Nickel Operations)[/caption] The study will include both economic and technical feasibility for using the infrastructure – shaft, underground development, surface facilities –  of the Nickel Rim mine that is expected to exhaust its reserves in 2022. The two companies hope they can exploit a number of deposits in close proximity. Vale’s Victor property and a shared deposit on the boundary of their properties are included. “A joint approach could allow for resources to be unlocked that would likely not otherwise be productive,” said Ricus Grimbeek, COO, Vale’s North Atlantic Operations and Asian Refineries. “Assuming a successful outcome to our study, this synergy could also lead to significant value generation – including job creation – at a time when the medium to long term market outlook for both nickel and copper looks very promising,” he added. “Assuming a positive outcome from the joint feasibility study, there are multiple benefits to the potential of coming together to mine deposits adjacent to boundaries that are accessible from Glencore’s Nickel Rim South mine infrastructure,” said Peter Xavier, VP of Glencore’s Sudbury Integrated Nickel Operations. A joint approach to the study is an extension of the parties’ past collaboration in the area. It is expected that the feasibility study will take approximately a year to complete. More details on the specifics of the potential arrangement will be shared once the study is complete. Please see either www.Vale.com/Canada  or www.SudburyINO.ca.

Comments

Your email address will not be published. Required fields are marked *

Apr 15 2024 - Apr 16 2024
Apr 16 2024 - Apr 16 2024
Apr 17 2024 - Apr 18 2024
Apr 17 2024 - Apr 18 2024