
Surge Copper’s Berg pre-feasibility outlines 28-year, $4.7B mine in BC
Surge Copper (TSXV: SURG) has released results of a pre-feasibility study (PFS) for its 100%-owned Berg project in central British Columbia, confirming […]

Surge Copper (TSXV: SURG) has released results of a pre-feasibility study (PFS) for its 100%-owned Berg project in central British Columbia, confirming […]

NORAM Electrolysis Systems (NESI) said it has received $5.6 million in funding to build electrochemical infrastructure for domestic lithium refining. The package […]